Posts tagged as:

Installed


www.honeywelluk.com Honeywell Sundial RF² packs are unique in being the only wireless products with the receiver built into the timer. Each pack includes a wireless enabled timer and a wireless thermostat: simply replace the timer and the thermostat works automatically, with no additional wiring. Packs for space heating and stored hot water also include a wireless cylinder thermostat. They feature TPI (Time Proportional and Integral) advanced energy saving control, which provides more accurate temperature control than traditional home controls and uniquely also matches boiler firing to system load, so the boiler operates much more efficiently.

{ 1 comment }

Living With Ed Episode Where Solatube Daylighting Systems Are Installed In The Begley Home

March 9, 2010

www.solatube.com Ed Begley Jr. and his wife, Rachel, continue to go green and save energy by installing Solatube Daylighting Systems – the smart alternative to skylights. The Begleys brighten thei… Enjoyed this article?More information on Go Green Tips!

Read the full article →

Wind Turbine Wooden Blades/ Installed Much Better With The Right Airfoil

March 2, 2010

A Quick video to show the wooden blades installed on my ametek, I have already achieved 105 watts with these blades Pvc ones only 82 watts, I am also setting up a forum on my website to help other … Enjoyed this article?More information on Go Green Tips!

Read the full article →

New Vertical Wind Turbine Installed

February 2, 2010

This web exclusive shows the new vertical wind turbine being installed at the Iowa Association of Municipal Utilities location in Ankeny, Iowa. There’s no narration, just local sights and sounds. … Enjoyed this article?More information on Go Green Tips!

Read the full article →

Helix Wind Turbine Installed In Malta By Di Natura

January 30, 2010

Compact, elegant, sophisticated, versatile… an icon for a movement. The Helix S322 provides smooth power and torque delivery across a broad range of wind speeds and under the most difficult of ph… Enjoyed this article?More information on Go Green Tips!

Read the full article →

Wind Turbine Installed In Overland Park Kansas At A.l. Huber General Contractor

December 25, 2009

A.L. Huber a general contractor in Overland Park, Kansas, United States successfully installed the world’s first “AES WindJet 5” wind turbine in November 2009 at their office headquarters in Overla… Enjoyed this article?More information on Go Green Tips!

Read the full article →

Electric Vehicle Charging Stations Prototype Installed On Solar Panel Tracking Arrays

December 17, 2009

EV-Charge America is displaying the Smartlet EV Charging Stations for use with 100% renewable energy applications powered by the sun. These installations will significantly reduce dependence on for… Enjoyed this article?More information on Go Green Tips!

Read the full article →
</